NEWS

Fire Stations 16 & 19


The Clackamas Fire Department is building two new fire stations. Fire stations #16 and #19 are both ground up builds. These are 12,000 square feet each and will house eight firefighters and a battalion chief. Through the Energy Trust of Oregon’s “Path to Net Zero” program, the project is incorporating energy-efficient envelope design, passive cooling, daylight harvesting, and rooftop solar panels.

FILTER BY CATEGORY

ABOUT ALLIANT  (1 News) CONSTRUCTION  (2 News) COORDINATORS  (0 News) ENGINEERING  (2 News) SERVICE  (2 News)

LATEST NEWS

DJC 2019 Top Projects

Alliant Systems contributed engineering and construction services to several of the 2019 Daily Journal of Commerce (DJC) Top Projects. Most notably, the project of the year is Field Office, which we provided HVAC design and construction services. The Field Office complex is two six-story buildings with 300,000 SF of office and retail and is LEED […]